Skip to main content

ERCOT · SPP · MISO · PJM · CAISO · NYISO · ISO-NE

What coincident peaks cost your facility

Free. No signup. A first-year range from four numbers, and whether the large-load minimum binds.

SPP network service 12CP, first year

$14M to $22M

a year, before your utility's loss and scaling factors

A range, because typed-in numbers can't say which hours set your tag. The report turns it into one figure from your interval data, your zone's filed rate and loss factors, and the days worth curtailing.

Opens an email with these inputs filled in. We reply with what to send.

Your facility

Your load at each month's coincident peak, averaged over twelve months. Central Prevailing Time.
MW
MWWhat you draw when you are not curtailing.
MW
of 12
$/kW-yrSPS zone, SPP rates effective Oct 1, 2026: Schedule 7 $48.16, Schedule 11 zonal $18.32 and region-wide $8.12. Other zones differ; enter yours. Leave blank for this default.