Texas’s grid,
tracked to the megawatt.
LLI Radar is the free, sourced record of ERCOT’s large-load interconnection queue. Every megawatt from request to reality, and the Batch Zero deadline counting down.
238.6 gigawatts requested.
Under four are live.
LLI Radar tracks the gap between what’s been requested and what’s real, filing by filing, straight from the primary ERCOT record.
Explore the trackerSource: ERCOT TAC Report, March 2026 · as of Mar 13, 2026
- Requested238,630MW
238.6 GW · Large-load interconnection queue · 100% of requested
- −96%of requested capacity never cleared ERCOT reviewApproved to energize9,042MW
9.0 GW · Cleared ERCOT review · 3.8% of requested
- −57%of approved capacity isn't yet drawing powerActually operatingLive3,883MW
3.9 GW · Observed peak demand · 1.6% of requested
The tracker is the front door. The product decides and acts.
Run, curtail, hedge, settle, dispute. It proves every recovered dollar with a signed audit trail.
The financial‑control and settlement‑assurance layer for ERCOT large loads. Built for the AI and HPC data centers, flexible‑load operators, and the QSEs that serve them.
Request access
See what your facility should have done.
We work with AI and HPC data centers, flexible‑load operators, and the QSEs that serve them. Tell us where to send the readiness brief.